KSG IAS - KSG India (Official Telegram Channel)
15.8K subscribers
16.5K photos
287 videos
1.72K files
21.7K links
We welcome you all to KSG IAS. We are a well known UPSC Coaching Institute in India preparing candidates for the Civil Services Examination at all three stages of the exam such as Prelims, Mains and Interview. Call 9654376543 9990999707 For More Details.
Download Telegram
Today's Headlines - 01 September 2023
First indigenous electric tractor
GS Paper - 3 (Energy)

India has launched the country's first indigenous fully-electric tractor, named CSIR-PRIMA ET11. The tractor was developed by India's state-owned Council for Scientific and Industrial Research and Central Mechanical Research Engineering Institute (CSIR-CMERI). The CSIR-PRIMA E11 is designed to cater to small and marginal farmers with around two hectares or less of farmland.

Salient features of the CSIR PRIMA ET11

The first very important point is that entire tractor has been designed and manufactured with indigenous components and technologies.
The main purpose of the tractor is to cater the demand of agriculture field application, it has been designed in such a way that its dynamics, weight distribution, transmission engagements, then lever and pedal position everything has been well designed and considered.
Another USP of the developed technology is that it Women friendly. For this we have given special attention in the ergonomics, for eg: All the levers, switches etc have been placed for easy approach to the women.
The farmers can charge the tractor using conventional home charging sockets in 7 to 8 hours and operate the tractor for more than 4 hours at the field. Otherwise, a tractor can run more than 6 hours in case of normal Haulage operation.
Coming to Transmission: The tractor is being designed with a robust and efficient transmission system by using the semi Synchronized type gearing system. The design helps to achieve the desired efficiency in min cost.
The tractor is equipped with best in class hydraulic with lifting capacity of 500 kg or more. It implies that the tractor can lift implements required not only for field operation but also hauling operation. It is also to be mentioned that the tractor can tow 1.8-ton capacity trolley with a max speed of 25 kmph.
Coming to electric aspects the battery we have chosen as the state of art Lithium ion battery with Prismatic cell confirmation. It has deep discharge capability for farming application and has a life of more than 3000 cycles.
Another distinct feature, we have provided that there is a port called V2L i.e. vehicle to load, this means when the tractor is not in operation, it battery power can be utilized for other secondary applications like pump and irrigation etc.

#upsc #news #headline #firstindigenous #electric #tractor #energy #india #CSIR #PRIMA #marginal #farmers #hectares #farmland #salient #dynamics #agriculture #USP #developed #technology #womenfriendly #ergonomics #sockets #haulage #operation #system #capacity #trolley #battery #prismaticcell #pump #irrigation #ton
Today's Headlines - 09 September 2023
Cabinet approves VGF for
battery storage system
GS Paper - 3 (Energy)

The Union Cabinet has approved a scheme for providing viability gap funding (VGF) for developing battery storage of 4 gigawatt (Gw) by 2030-31. The VGF for the battery energy storage system (BESS) will have an initial outlay of Rs 9,400 crore and this will include a budgetary grant of Rs 3,700 crore.

More about the News

The VGF would be disbursed in five tranches and be linked with the various stages of implementation of BESS projects. The scheme is aimed at supporting the energy storage needs of the renewable energy sector, especially solar and wind.
Given their restricted hours/seasons of operation, energy storage ensures round-the-clock green energy.
The VGF scheme for BESS projects was first announced in Budget 2023. Through the scheme, the Centre is aiming to bring down the cost of battery storage systems and increase their viability.
By offering VGF support, the scheme targets achieving a Levelized Cost of Storage (LCoS) ranging from Rs 5.50-6.60 per kilowatt-hour (kWh), making stored renewable energy a viable option for managing peak power demand across the country, said a statement by the ministry of power.
The statement further said that 85 percent of BESS projects under the scheme would be provided to the power distribution companies (discoms).
This will not only enhance the integration of renewable energy into the electricity grid but also minimise wastage while optimising the utilisation of transmission networks. Consequently, this will reduce the need for costly infrastructure upgrades.
Developers for these BESS projects would be selected through a competitive bidding process, to be open for both public and private sector. This approach will foster healthy competition and encourage the growth of a robust ecosystem for BESS, attracting significant investments and generating opportunities for associated industries.

#upsc #headline #news #cabinet #VGF #battery #storage #system #energy #unioncabinet #gigawatt #BESS #budgetary #fivetranches #scheme #projects #LCOS #kilowatt #hour #discoms #minimise #wastage #optimising #utlisation #networks #healthy #competition #robust #ecosystem #privatesectors #upgrades #investments #peakpower #country #ministrypower #support #devloping #crore #seasons #solar #wind #viability