LTASingapore
37K subscribers
2.12K photos
531 videos
555 links
Bite-sized info on Singapore’s land transport. Brought to you by the Land Transport Authority. For more, follow us on:

FB: facebook.com/WeKeepYourWorldMoving
IG: instagram.com/ltasg
TW: twitter.com/ltasg
YT: youtube.com/LTASingapore
TT: tiktok.com/@ltasg
Download Telegram
Hooray, we’ve just completed the first phase of the Singapore Rail Test Centre (#SRTC). Construction of the high speed test track in this facility is now completed and the track is ready for operation! 🙌🥳

Slated for completion in 2025, the SRTC is the first train testing facility in Southeast Asia and will be a comprehensive testing platform for multiple railway systems before they are deployed on the main line. 🚆⚙️ This will facilitate round-the-clock testing and free up limited engineering hours on operational lines for maintenance and renewal works – which is aimed at strengthening the reliability of our rail network! 🔧

#DidYouKnow We’ve begun testing and commissioning works for the first 2 Circle Line 6 (#CCL6) trains 🧡 at the facility. The SRTC is also designed and operated with sustainability in mind e.g. energy-saving equipment, solar panels, and a hybrid cooling system. #MyGoGreenFlags 💚
Media is too big
VIEW IN TELEGRAM
#ICYMI Our high speed test track at the Singapore Rail Test Centre (#SRTC) is now ready for operation! 🙌🥳

Take a sneak peek at one of the tests we’ve been carrying out on our 2 new #CCL6 trains at the high speed test track above! 👆
#DidYouKnow From 2025, we’ll be able to carry out train testing all day, everyday right on our shores! 🤩 🔧⚙️🚆

Find out how the new Singapore Rail Testing Centre (#SRTC) will enhance train and rail reliability in our latest issue of CONNECT ➡️ https://go.gov.sg/read-connectsrtc
#GoodNews The Singapore Rail Test Centre (#SRTC) is now open! 🥳

Featuring three test tracks to assess trains for their speed, performance and integration, as well as endurance, the SRTC can accommodate various signalling and communication systems used across the MRT network.🚆🛠

With the SRTC, we can now conduct round-the-clock testing of trains in a controlled and localised environment, freeing up engineering time for other maintenance works. This will help us further enhance the reliability and efficiency of the rail network. 💪

#FunFact SRTC is green too! 💚 With sustainable features such as smart lighting control, solar photovoltaic panels and a hybrid cooling system, it has received BCA’s Green Mark Platinum Certification! #BuildLite

Check out our photos for some of the highlights from our opening event earlier today.
Media is too big
VIEW IN TELEGRAM
What’s it like inside the newly open Singapore Rail Test Centre (#SRTC)? 🚆🛠 Watch our video for a first look of its interior and understand the facility’s capabilities.
This media is not supported in your browser
VIEW IN TELEGRAM
Meet James, a Senior Project Engineer working at the Singapore Rail Test Centre (#SRTC), as he walks us through our brand new train testing facility. Find out how it will enhance the reliability and efficiency of the rail network. #FacesOfLTA