All I want for Christmas is… to #MoveLite! 🤩❄️🎄
From now till 2 Jan 2025, have a holly jolly ride on our Christmas-themed trains, buses and at MRT stations! 🚌🚇
Enjoy the festive decor on selected trains on all MRT lines, or on bus services 14, 65, 190, 197 & 960.
You can also check out the festive murals at Bedok #EWL, Bukit Panjang #DTL, Dhoby Ghaut #NEL/#CCL, Great World #TEL, Marine Parade #TEL, Sengkang #NEL and Woodlands South #TEL MRT stations!
From now till 2 Jan 2025, have a holly jolly ride on our Christmas-themed trains, buses and at MRT stations! 🚌🚇
Enjoy the festive decor on selected trains on all MRT lines, or on bus services 14, 65, 190, 197 & 960.
You can also check out the festive murals at Bedok #EWL, Bukit Panjang #DTL, Dhoby Ghaut #NEL/#CCL, Great World #TEL, Marine Parade #TEL, Sengkang #NEL and Woodlands South #TEL MRT stations!
Check out these ✨ green features ✨of the new Punggol Coast station, opening on 10 Dec 2024, 3pm! 💚🌱
#ICYMI Punggol Coast station will bring over 200,000 households within a 10-min walk of a #NEL station. Residents can enjoy shorter travel times to the city centre and other parts of Singapore.
#ThereRailBeMore #MoveLite
#ICYMI Punggol Coast station will bring over 200,000 households within a 10-min walk of a #NEL station. Residents can enjoy shorter travel times to the city centre and other parts of Singapore.
#ThereRailBeMore #MoveLite
#GoodNews Westies! We’ve just awarded the contract to operate the Jurong Region Line (#JRL) to the joint venture between SBS Transit Rail and RATP Dev Asia Pacific, a subsidiary of the French public transport operator, RATP Dev.
SBST Transit Rail and RATP Dev Asia Pacific will operate the line for 9 years, with an option to extend another 2 years. During this time, they have committed to use the experience of RATP Dev to build local capabilities in rail operations and maintenance.
JRL, our 7th MRT line, will open in phases from 2027. It’ll enhance connectivity in western Singapore, including NTU, Jurong Industrial Estate, and Jurong Innovation District.
The operator for CRL will be selected at a later stage.
SBST Transit Rail and RATP Dev Asia Pacific will operate the line for 9 years, with an option to extend another 2 years. During this time, they have committed to use the experience of RATP Dev to build local capabilities in rail operations and maintenance.
JRL, our 7th MRT line, will open in phases from 2027. It’ll enhance connectivity in western Singapore, including NTU, Jurong Industrial Estate, and Jurong Innovation District.
The operator for CRL will be selected at a later stage.
Good news! The Johor Bahru – Singapore Rapid Transit System (#RTS) Link project is reaching another significant milestone. 🥳
🛤️ By the end of 2024, works will commence for the installation of the RTS Link rail systems, including the laying of tracks and signalling systems.
🚆 In 2025, we will also begin the works to connect the RTS Link to the existing Thomson-East Coast Line (#TEL) Woodlands North station at Basement 1. This will allow commuters to seamlessly transfer between RTS Link and our MRT network.
⬆️ Check out our visuals for more info.🏗️
🛤️ By the end of 2024, works will commence for the installation of the RTS Link rail systems, including the laying of tracks and signalling systems.
🚆 In 2025, we will also begin the works to connect the RTS Link to the existing Thomson-East Coast Line (#TEL) Woodlands North station at Basement 1. This will allow commuters to seamlessly transfer between RTS Link and our MRT network.
⬆️ Check out our visuals for more info.🏗️
Media is too big
VIEW IN TELEGRAM
🏗️ Peek behind the scenes of Singapore's North-South Corridor construction (NSC)!
Connecting the north and the city through densely built-up areas, the #NSC is one of our most complex road projects. #DoYouKnow it will comprise the longest viaduct (8.8km) and road tunnel (12.3km) in Singapore?
While residents may experience inconvenience during construction, #RestAssured we're working hard to minimise disruptions. Where feasible, we're deploying innovative technologies to improve construction efficiency.
🎥 Watch to discover how we're boosting pre-cast production for the viaduct!
Connecting the north and the city through densely built-up areas, the #NSC is one of our most complex road projects. #DoYouKnow it will comprise the longest viaduct (8.8km) and road tunnel (12.3km) in Singapore?
While residents may experience inconvenience during construction, #RestAssured we're working hard to minimise disruptions. Where feasible, we're deploying innovative technologies to improve construction efficiency.
🎥 Watch to discover how we're boosting pre-cast production for the viaduct!
Media is too big
VIEW IN TELEGRAM
It’s time for the 2024 Singapore BusTech and RailTech Grand Challenge! 🚍🤩🚆
Today, bus and rail technicians from our Public Transport Operators (PTOs) and students from Institutes of Higher Learning (IHLs) will be showcasing their skills and creativity in solving land transport issues. 🧠🛠
Curious? Here’s a sneak preview of some of the challenges. 👀 Stay tuned to our socials today as we reveal the final winners!
P.S. if you’re keen to pursue a career in or learn more about the bus or rail industry, swing by the Public Transport Career Fair on 4 Dec 2024 at Devan Nair Institute Hall 1 from 10am to 4pm and discover more than 300 job opportunities offered by our PTOs!
Today, bus and rail technicians from our Public Transport Operators (PTOs) and students from Institutes of Higher Learning (IHLs) will be showcasing their skills and creativity in solving land transport issues. 🧠🛠
Curious? Here’s a sneak preview of some of the challenges. 👀 Stay tuned to our socials today as we reveal the final winners!
P.S. if you’re keen to pursue a career in or learn more about the bus or rail industry, swing by the Public Transport Career Fair on 4 Dec 2024 at Devan Nair Institute Hall 1 from 10am to 4pm and discover more than 300 job opportunities offered by our PTOs!
Media is too big
VIEW IN TELEGRAM
Here’s a peek into the ongoing construction of the East Coast Integrated Depot (ECID), our unique Four-In-One-Depot, that integrates three train depots and one bus depot within a single site! The ECID will strengthen the resilience of our rail network by allowing us to launch and withdraw trains more efficiently, giving us greater ability to adjust service patterns as needed. 🟢🟤🔵
#DoYouKnow we have completed ~98% of structural and architectural works and incorporated numerous innovative features to make the development more sustainable?🌱.
📢 In the next phase of construction, we’ll progressively lay new train tracks to connect the #EWL to #ECID.
🚉 As part of this, #EWL train services will be temporarily adjusted at Tanah Merah, Simei, Tampines, Pasir Ris, Expo, and Changi Airport stations from 7 to 10 Dec 2024.
🗓️ During this period, there will be no train service at Simei, and between Tanah Merah and Tampines stations.
🔗 Refer to https://go.gov.sg/ecid-trackworks for more details!
#DoYouKnow we have completed ~98% of structural and architectural works and incorporated numerous innovative features to make the development more sustainable?🌱.
📢 In the next phase of construction, we’ll progressively lay new train tracks to connect the #EWL to #ECID.
🚉 As part of this, #EWL train services will be temporarily adjusted at Tanah Merah, Simei, Tampines, Pasir Ris, Expo, and Changi Airport stations from 7 to 10 Dec 2024.
🗓️ During this period, there will be no train service at Simei, and between Tanah Merah and Tampines stations.
🔗 Refer to https://go.gov.sg/ecid-trackworks for more details!