The difference between the highest flood level and lowest point on the under side of the bridge super structure is known as
Anonymous Quiz
23%
Head room
23%
Water way
37%
Free board
17%
Clearance
At bridge site the water way should be least obstructed to avoid
Anonymous Quiz
24%
Scouring
17%
Silting
18%
Afflux
41%
All of the above
As per IRC standards the minimum grip length should be of the maximum scour depth for road bridges and one half of the maximum scour depth for railway bridges
Anonymous Quiz
20%
One half
44%
One third
29%
Two third
7%
One fourth
The floor provided between masonry walls constructed below river bed is known as
Anonymous Quiz
36%
Retaining wall
26%
Wing wall
23%
Breast wall
15%
Curtain wall
At the site of a permanent construction to pervent the entry of water a temporary structure constructed is known as
Anonymous Quiz
33%
Earthern dam
20%
Ciasson
41%
Coffer dam
7%
none of the above
The intermediate support in a bridge is called
Anonymous Quiz
17%
Wing wall
12%
Bearing wall
57%
Pier
14%
Abutment
The longitudinal timber of the bridge which carry the load of the bridge are known as
Anonymous Quiz
14%
Wooden joint
56%
Wooden girders
19%
Road bearers
11%
Cribs
The frame work formed by longitudnal and cross beams of alternate layers is known as
Anonymous Quiz
27%
Cribs
19%
Crates
27%
Pile Bents
26%
Timber trestles
Temporary bridge is provided under the condition when
Anonymous Quiz
15%
sufficient funds are not available
23%
time for construction is short
11%
technical know how is not available
51%
all of the above
Tee bean birdge are generally constructed as
Anonymous Quiz
37%
Deck bridge
24%
Through bridge
30%
Semi through birdge
9%
None of the above
Courbon method of designing is adopted for
Anonymous Quiz
24%
Flat slab bridges
28%
T beam bridges
44%
Cable stayed bridges
4%
None of the above
As peer IRC the bridges on National Highways are designed
Anonymous Quiz
23%
For IRC class AA loading
16%
For IRC class A loading
52%
For IRC class A loading and checked for IRC class AA loading
9%
For IRC class AA loading and checked for IRC class A loadind
The type of loading to be considered while designing temporary bridges is
Anonymous Quiz
27%
IRC class AA
29%
IRC class A
26%
IRC class B
19%
IRC class 70 R
For designing railway bridges the loads considered are as per
Anonymous Quiz
18%
IRC class 70 R
29%
IRC class AA
29%
Equivalent uniformly distributed load as per brigde rules
25%
IRC class 70 A for designing and class AA for checking
The bridge which can be rolled forwardd and backward is called as
Anonymous Quiz
22%
Vertical lift bridge
14%
Pontroon birdge
51%
Traversing bridge
14%
Bascule bridge
The projection provided on a pier on its down stream side is called
Anonymous Quiz
43%
offset water
24%
cut water
25%
ease water
8%
none of the above
9oct (Today) 8pm
complete som marathon in a unique way.
you will get
1. all topics concept
2. all topics questions
3. pdf.
4. qssignment
5. som practice qstions.
6. msq qstions.
lets study complete som Today 8pm on you tube.
like and share the session guys.🔥🔥🔥🔥🔥🕗🕗🕗🕗🕗🔈🔈🎯
https://youtu.be/ZlTMqMxYW4c
complete som marathon in a unique way.
you will get
1. all topics concept
2. all topics questions
3. pdf.
4. qssignment
5. som practice qstions.
6. msq qstions.
lets study complete som Today 8pm on you tube.
like and share the session guys.🔥🔥🔥🔥🔥🕗🕗🕗🕗🕗🔈🔈🎯
https://youtu.be/ZlTMqMxYW4c
The number of degrees of freedom of a point in space is
Anonymous Quiz
35%
3
36%
6
10%
9
19%
unlimited number
The minimum number of overall equilibrium equations for plane truss analysis must be equal
Anonymous Quiz
24%
2
53%
3
19%
6
3%
unlimited number
The minimum number of equilibrium equations for a plane frame structural analysis must be equal to
Anonymous Quiz
25%
2
55%
3
18%
6
3%
undefined number