A culvert having a length less than 1 m is called
Anonymous Quiz
12%
Minor bridge
28%
Vent way
38%
Culvert
22%
Viaduct
The bridge having its floor supported at the top of the structure is known as
Anonymous Quiz
14%
Semi through bridge
53%
Deck bridge
20%
Through Bridge
13%
Submersible bridge
The bridge having its floor flush or a little above the bed of the stream which allows flood water always to pass over its super structure is called as
Anonymous Quiz
12%
Vent way
33%
Minor Bridge
31%
Cause way
24%
Viaduct
The bridge constructed to enable a road to pass under another land communication route is called an
Anonymous Quiz
28%
Under bridge
21%
Over bridge
34%
Subway
18%
Flyover
The bridge having its floor supported at the bottom of the main girders is called
Anonymous Quiz
30%
through bridge
41%
deck bridge
23%
semi through bridge
6%
none of these
The walls constructed on both sides of the abutments to retain the earth of the bridge approaches are known as
Anonymous Quiz
50%
Wing wall
13%
Piers
24%
Abutments
13%
Abutment pier
The drainage structutre provided to pass the abutments to retain the earth of the bridge approaches are known as
Anonymous Quiz
32%
Cause way
20%
Viaduct
25%
Vent way
24%
Aquaduct
Forwarded from UNACADEMY STUDY GROUP GATE 2023 < MOHAN >
The centre to centre distance between any two adjacent supports of a bridge is called
Anonymous Quiz
45%
Span
13%
Economic span
41%
Clear span
2%
None of these
The difference between the highest flood level and lowest point on the under side of the bridge super structure is known as
Anonymous Quiz
23%
Head room
23%
Water way
37%
Free board
17%
Clearance
At bridge site the water way should be least obstructed to avoid
Anonymous Quiz
24%
Scouring
17%
Silting
18%
Afflux
41%
All of the above
As per IRC standards the minimum grip length should be of the maximum scour depth for road bridges and one half of the maximum scour depth for railway bridges
Anonymous Quiz
20%
One half
44%
One third
29%
Two third
7%
One fourth
The floor provided between masonry walls constructed below river bed is known as
Anonymous Quiz
36%
Retaining wall
26%
Wing wall
23%
Breast wall
15%
Curtain wall
At the site of a permanent construction to pervent the entry of water a temporary structure constructed is known as
Anonymous Quiz
33%
Earthern dam
20%
Ciasson
41%
Coffer dam
7%
none of the above
The intermediate support in a bridge is called
Anonymous Quiz
17%
Wing wall
12%
Bearing wall
57%
Pier
14%
Abutment
The longitudinal timber of the bridge which carry the load of the bridge are known as
Anonymous Quiz
14%
Wooden joint
56%
Wooden girders
19%
Road bearers
11%
Cribs
The frame work formed by longitudnal and cross beams of alternate layers is known as
Anonymous Quiz
27%
Cribs
19%
Crates
27%
Pile Bents
26%
Timber trestles
Temporary bridge is provided under the condition when
Anonymous Quiz
15%
sufficient funds are not available
23%
time for construction is short
11%
technical know how is not available
51%
all of the above
Tee bean birdge are generally constructed as
Anonymous Quiz
37%
Deck bridge
24%
Through bridge
30%
Semi through birdge
9%
None of the above
Courbon method of designing is adopted for
Anonymous Quiz
24%
Flat slab bridges
28%
T beam bridges
44%
Cable stayed bridges
4%
None of the above