ps
Maintenance: Mechanical & electrical
Power Stations:
For passenger, freight, metro, bogie sectors
Warehouses: Raw materials, finished products, tools, spare parts, fuel
Miscellaneous: Sheds, security fences, garages

Development Priorities

1. Plasma Building (Freight Assembly No. 2)

Objective: Upgrade building structure, equipment, lighting, ventilation, and compressed air systems.

Equipment Review:

7 plasma cutting machines listed (2 decommissioned, 2 sold).

Currently, 2 CNC plasma machines are non-functional; 4 manual units in poor condition.


Building Components:

Steel frame with corrugated sheets, 4 doors, air vents, lighting, overhead crane, compressed air lines.


Proposed Works:

Install smoke extraction

Organize material flow

Improve lighting and air systems

Replace windows/doors

Decommission non-functional machines based on maintenance reports (approved in Oct 2019)

Proposed Development for Production Unit

Design & R&D

Establish a strong foundation for in-house design and research.

Localize railcar design within 7–10 years to compete globally.

Allocate annual budgets for design system development.

Build skilled design teams to phase out foreign dependency.

Machinery & Manpower

Gradual shift to automated systems to reduce labor dependency.

Prepare an annual renewal plan for machines with financial breakdown.

Reassess staffing needs per unit workload and utilize surplus across units.


IT Systems

Upgrade information systems with an annual budget.

Digitize all departments and production planning systems.

Extend network infrastructure to workshops and warehouses.

Local Manufacturing

Develop a detailed timeline and costed plan to localize component manufacturing.

Quality Assurance

Ensure both intermediate and final product quality.

Train staff on quality standards to achieve full compliance.

Future Vision

1. Increase factory revenues

2. Strategic production planning

3. Outsourcing and external project acquisition

4. Human resource development and well-being

5. Benchmarking against global standards

6. Attract investments to boost production

7. Maximize asset utilization inside and outside the facility.


#Engineering #SEMAF #Egypt2030 #RailwayManufacturing #AOI #IndustrialDevelopment #Localization #SmartFactories #LinkedInEngineering